Created alongside your design SAP calculations, confirming specified insulation values, materials and thermal junctions.
Updated after construction to reflect what was installed on site.
We collect or verify mandatory construction photos, including:
Confirmation that materials used (insulation, windows, doors, thermal elements) match the SAP design.
We provide digital copies for your records and for Building Control approval.
Created at the same time as design-stage SAP calculations, before construction begins.
Completed after construction when photos, final specifications and air test results are available.
We guide you through both stages to ensure smooth compliance.